Philipp Lehnert
Philipp Lehnert is CEO of the Vector Foiltec Group – a post he has held since 2018. The roof and facade systems company from Bremen operates globally, with production sites in Germany and China. After studying in Hamburg and Singapore, Lehnert, an industrial engineering graduate, joined the family business in 2011. He went on to complete an MBA programme at the University of St Gallen in 2018. In his current role, Lehnert manages global sales activities and is in close contact with the group’s Chinese subsidiary. The company’s achievements include building the foil façade of the Olympic Swimming Stadium in Beijing (2007), the Dalian Stadium (2013) and several shopping centres, as well as infrastructure projects and office buildings throughout China.